Mfg Part Number: CK 104 LONG LEAD | Alternate P/N: CK104LONGLEAD | Manufacturer: Crl Components Inc |
NSN : 5910-00-113-5499 | NIIN : 001135499 | Item Name : capacitor fixed cer |
CAGE Code : 71590 | FSC : 5910 Capacitors |
Stacked Aerospace is an industry-leading distributor of NSN parts, including NSN 5910-00-113-5499. We are owned and operated by ASAP Semiconductor and offer some of the fastest lead times and most cost-effective solutions in the industry. This premium NSN part CK 104 LONG LEAD is manufactured by Crl Components Inc and is listed alongside the Part Number CK 104 LONG LEAD and description Capacitor Fixed Cer. If you would like to receive a quick quote for this part, just fill out the Instant RFQ form provided on this page. Once you have submitted your request, one of our experts will review it and return with a personalized quote within 15 minutes or less.
Stacked Aerospace is your sourcing solution for Crl Components Inc parts with the CAGE Code 71590 and other NSN components. National Stock Numbers (NSNs) are 13-digit numeric codes assigned to unique items manufactured, bought, and sold within the federal supply chain. This codification system has been used by the U.S. since WWII and has since been adopted by all NATO-allied Nations. All of the items we offer, including 5910-00-113-5499, ship quickly from one of our international supply-chain locations with full traceability. Additionally, we ensure that much of our inventory is subjected to rigorous quality assurance testing to ensure customers receive the highest quality items. Submit an RFQ today for NSN part CK 104 LONG LEAD and see how we can meet your parts requirements with ease.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item Description: Capacitor Fixed Cer | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
CK 104 LONG LEAD | B | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0/+15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
![]() |
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”. |
We Hope that You Will Visit Us Again the Next Time You Need NSN Parts and Make Us Your Strategic Purchasing Partner.
Request for Quote